Cutter 2 – Cooperation or Chaos? |
|
Process
|
|
|
1.
Idea --
can come from any level but most likely to be heard closer to the top |
|
|
2.
Buy-in --
needs to happen at the top; support by senior administrators because
of the need for major resources |
|
|
3.
Reality check --
determine feasibility and verify goal; involves key stake-holders, top-level
administrators, and administration at library institution level |
|
|
4.
Detailed feasibility study -- primarily done at library institutional level, with user input, and involves consultants. |
|